Three certificates, with the numbers on them.
All three are held by the plant that assembles your board, and all three are current. They are sent to customers together with a letter of authorisation from Heng Hai Electronics naming Shenzhen Zhipin Technology Electronics as its authorised commercial and export arm, so the certificate and the invoice can be read as one chain. The scope on each one is printed below as certified — including the exclusion on the automotive certificate, because a scope you cannot read is a scope you should not trust.
What the plant holds, and what it does not.
- Certificate
- 38824Q00171R001
- Valid from
- 2026-09-01
- Valid to
- 2029-08-31
- Certificate
- 38824E00520R0M
- Valid from
- 2024-09-18
- Valid to
- 2027-09-17
- IATF cert
- 0502748
- CASC cert
- 2024A541
- Valid to
- 2027-02-27
Read the IATF exclusion carefully: the plant is certified for manufacturing circuit board assemblies, not for designing them. If your programme needs a design-responsible supplier, that is a different conversation and we would rather have it now than in an audit.
Five gates, and each one can stop the lot.
Quality is a department here, not a hat the line leader wears: 44 people across incoming, in-process, final and outgoing inspection, plus the repair and analysis bench that closes the loop.
IQC Incoming inspection
Every component lot is checked against the BOM — package, marking, quantity, moisture condition — before it is allowed near a line. Reels are barcoded on arrival and scanned at the feeder, so a part cannot be loaded without the system agreeing.
IPQC In process
Solder paste inspected after printing and before reflow; AOI after reflow against the golden board; X-ray on BGA and hidden joints; first article approved by you before the run continues.
FQC Final
Electrical and functional test on every board, visual inspection against IPC class, then packing review against your specification. Faults go to the repair bench with the failure recorded, not back into the line anonymously.
OQA Outgoing
Barcode and accessory cross-check, carton weight, label against the shipping document. The last gate is the one that catches somebody else's mistake.
DOC Traceability
Component lot numbers, reflow profile and test results are filed against the serial number of each board and stay retrievable years later.
| Certificate scans | ISO 9001, ISO 14001, IATF 16949 — full PDF with numbers and validity |
| First article report | Dimensional, electrical and functional results on the first board of the lot |
| Inspection images | AOI images and X-ray of BGA and hidden joints for your lot |
| Material records | Component lot codes and supplier invoices for purchased material |
| Process records | Reflow profile used, paste and stencil batch, test program revision |
| Failure log | Test failures, rework performed and the analysis behind each |
Anything in this table is available before you place the order, not only after. Ask during the DFM stage and it arrives with the quotation.
One system from work order to carton.
Production does not run on paper travellers and shift notes. Order, reel, board and carton are scanned into the same MES, so "what happened to my lot" is a screen that can be opened rather than a phone call that has to be made.
Order & planning
Work order issued · BOM locked · ERP link · production plan
Material & warehouse
Supplier barcode · incoming barcode · IQC · put-away · smart rack · issue to line
Setup & placement
Paste, stencil and squeegee control · station table · feeder scan · mounted-station record · first article
DIP & process
DIP station scan · panel loading · route control · work-order range control
Test & marking
Test program link · laser marking · board-to-mark binding
Pack & ship
Barcode cross-check · accessory binding · carton label · carton weight · IPQC · OQA · kanban
Audit us before you order, not after.
Customer and third-party audits are scheduled through the sales contact. Certificate scans, sample reports and a video walk-through of the line are available on request.