The line list, line by line.

Ten SMT lines, three DIP lines, three test lines and two packing lines — with the actual machine configuration on each one, the throughput each stage can hold, and the people standing behind it. Numbers here are the ones on the production board, not rounded for a brochure.

01 / SMT

Ten SMT lines, all built on Fuji NXT modules.

Every line runs inline SPI before reflow and inline AOI after it. The configurations differ because the product mix differs — a line set for small-passive density is not set up for large connector panels, and pretending otherwise is how changeover time gets hidden in your lead time.

Placement configuration per line
LinePlacement configurationNotes
SMT-1NXT-III × 4 + NXT-II × 8 + XP243E × 2High-mix, large feeder count
SMT-2NXT-III × 6 + NXT-II × 4 + XP243E × 2High-mix
SMT-3NXT-III × 4 + NXT-II × 6 + XP243E × 2High-mix
SMT-4NXT-III × 4 + NXT-II × 4 + XP243E × 2Flexible, quick changeover
SMT-5NXT-III × 6 + NXT-II × 6 + XP243E × 2High-mix
SMT-6NXT-III × 10 + NXT-II M6 × 4High-volume, fewer changeovers
SMT-7NXT-II × 4 + XPF-L × 1Flexible, odd-form and tray parts
SMT-8NXT-II × 4 + XP243E × 2Short runs and samples
SMT-9NXT-III × 10 + NXT-II × 4 + XP243E × 2Highest placement count
SMT-10NXT-III × 4 + XP243E × 2Compact builds

Hourly placement rate depends on configuration and product mix — roughly 100,000 to 460,000 points per hour per line. In aggregate the ten lines hold about 63.6 million points per day and 1.64 billion points per month, counted on a 23-hour working day and a 26-day month. We quote your board against the line it will actually run on, not against the total.

Stage capacity
StageLinesMonthlyPeople
SMT10≈1.64 bn points94 production + 18 engineering
DIP3140,400 boards126 (with 4F assembly)
Test3140,400 boards56 production + 10 + 16 engineering
Packing2122,200 sets50
Site
Plant area12,000 m² self-built — one production building plus three dormitory buildings
LocationBuilding 18, Maozhou Industrial Zone, No.21 Shapuwei Road, Songgang Street, Bao'an District, Shenzhen 518105
Headcount406 on the roll · 393 to 407 present on the two most recent attendance records
ShiftsDay and night production; 23-hour effective SMT day
02 / DIP, test, packing

Through-hole, test and pack — the three stages people forget to ask about.

A supplier can have thirty SMT lines and still lose your order at the test bench or the packing table. These are the numbers on those two stages.

DIP lines — through-hole and mixed-technology
LineEquipmentOutput
DIP-1JUKI KE-2060RM · wave solder · JST-980 board washer · pre-wave AIIS-D13-400180 pcs/h · 1,800/day · 46.8K/month
DIP-2Judi insertion + JUKI KE-2060RM · Nitto M450 wave solder · XD-368AM washer · pre-wave AIIS-D13-400 · post-wave AIIS-D511 double-sided AOI180 pcs/h · 1,800/day · 46.8K/month
DIP-3JUKI KE-2060RM · wave solder · JST-980 board washer · pre-wave AIIS-D13-400180 pcs/h · 1,800/day · 46.8K/month

Three lines total 140,400 boards per month. Post-wave AOI is installed on DIP-2; on the other two lines the AOI check is done at the SMT stage or by visual inspection against IPC class, and we will tell you which applies to your board.

Test and packing
StageConfigurationOutputTest coverage
TEST-17 stations, 7 operators180 pcs/h · 1,800/day · 46.8K/monthFunctional, per unit
TEST-27 stations, 7 operators180 pcs/h · 1,800/day · 46.8K/monthFunctional, per unit
TEST-37 stations, 7 operators180 pcs/h · 1,800/day · 46.8K/monthFunctional, per unit
PACK-124 people · pre-pack AOI AIIS-D511 · pre-pack AIIS-D13-400200 pcs/h · 2,000/day · 52K/monthBarcode and accessory cross-check
PACK-226 people270 pcs/h · 2,700/day · 70.2K/monthBarcode and accessory cross-check
03 / People

406 people, and where they actually sit.

Headcount is easy to inflate on a website. This is the department breakdown we report internally, which is the version that has to survive an audit visit.

Headcount by department
DepartmentPeopleFunction
SMT production94Line operation
SMT engineering18Program, profile, DFM
DIP / 4F assembly126Through-hole, assembly
Test production (6F)56Functional test
Test engineering (1F)10Fixture and program
Test repair (1F)16Fault analysis
Quality44IQC, IPQC, FQC, OQA
Warehouse18Material control
PMC9Planning
Other15Admin, facility
Process envelope
Smallest part01005 (0402 metric); 0201 also routine
Package rangeFine-pitch QFP/QFN, BGA, CSP, LGA
Panel widthUp to 450 mm along the conveyor
Panel minimum50 × 50 mm
Board thickness0.4 mm minimum
Layer countBare boards are sourced to your Gerber; up to 20 layers is routine, and the assembly is not limited by the stack-up
Reflow12-zone (JT12), profile per product, stored against the lot
AOIKI-AOI V215-L inline, after reflow
SolderLead-free, wave and selective solder for through-hole
CoatingConformal coating with an agreed mask list

Ask us for these before you commit

Four documents that separate a real factory from a trading desk
  • Certificate scans with registration numbers
  • First-article inspection report for your build
  • AOI and X-ray images of your lot
  • Component lot records and supplier invoices