PCBA contract manufacturing · Shenzhen, China

Turnkey PCBA for hardware that has to keep running.

Industrial control, BMS, energy storage and medical boards — bare board sourced, components bought on your BOM, assembled on ten SMT lines and three DIP lines in a 12,000 m² plant in Shenzhen, tested board by board. One English-speaking engineer owns your account from the first DFM note to the final test log.

Build specRev 1.0
500 pcsProduction MOQ
48 hDFM + BOM feedback
2–3 daysPrototype build
100%Electrical test
Three production scenes at the Songgang plant: AOI inspection at the end of reflow, a Fuji NXT placement line, and a DIP through-hole insertion line
Three scenes, one site · AOI, SMT and DIP under one roof · Songgang, Shenzhen · ISO 9001 · IATF 16949 · ISO 14001
12,000 m²Self-built site, Songgang
10 + 3SMT lines + DIP lines
400+Staff · 53 QA · 38 engineers
100+Customers served
01 / Services

Four things we do, and we do all four in-house.

Most PCBA suppliers quote you a price and then hand half the work to someone else. Here the bare board, the components, the assembly and the test all come back to one production plan — and one person you can call.

01

PCBA assembly

High-mix, low-to-medium volume assembly. Prototype and new-product introduction from a single board, production runs into the tens of thousands — same line, same process control.
0201QFN / QFPBGA / CSPDouble-sided
02

SMT & DIP

Ten SMT lines running Fuji NXT placement, a 12-zone reflow oven, inline SPI and inline AOI — plus three DIP lines for through-hole and mixed-technology boards. Both processes on one panel is normal work here, not a special request. Every station answers to the same MES.
10 × Fuji NXT2 multi-function3 DIP lines12-zone reflowInline SPI/AOI
03

BOM procurement

Turnkey sourcing from authorised distributors — Arrow, Digi-Key, Mouser and their local partners. Three purchasing desks in Shenzhen, Hong Kong and the United States, with our own import-export licence, so a US lead-time problem is solved in US stock rather than waiting on a shipment. You get cost-down options side by side, not one number: keep the original part, take a qualified alternate, or let us hunt the obsolete line.
Authorised onlyShenzhen / HK / USAlternatesObsolete search
04

Box build & test

Enclosure assembly, cable and harness integration, functional test, burn-in on request, then packing and drop-shipping straight to your customers. You get a finished unit, not a pallet of boards.
EnclosureHarnessBurn-inDrop-ship
03 / Inside the plant

The board is the deliverable. The invoice is just paperwork.

Every build ships with its BOM, its test log and its component lot records on file. No board leaves the floor on a promise — it leaves on a signature.

Industrial control board assembled by Zhipin: green solder mask, 0201 passives, shielded module, HDMI and RJ45 connectors
Built at Zhipin. The board carries our own silkscreen: SHENZHEN ZHIPIN TECHNOLOGY CO., LTD.
Bare boardSourced and inspected on arrival
MaterialBought on your BOM, lot recorded
AssemblySMT, DIP, selective solder
InspectionSPI, AOI, 3D X-ray
Test100% electrical, functional
Out the doorSerialised, packed, documented
RK3288 controller board assembled at the plant: shielded wireless module, dual USB, HDMI and Ethernet ports
RK3288 controller board · shielded wireless module, dual USB, HDMI, Ethernet
Compact controller board with 0201 passives, castellated edges and an antenna keep-out area
Compact controller board · 0201 passives, castellated edge, antenna keep-out
Fuji NXT placement line with feeders loaded across the modules, running a high-mix build
Fuji NXT placement · modules loaded with feeders for a high-mix run
Inline AOI station at the end of the reflow oven, with a board image held on screen
Inline AOI · every board imaged and compared against the golden board after reflow
DIP line: operators inserting through-hole components on an ESD-grounded conveyor with component trays
DIP line · through-hole insertion on grounded stations, one component tray per position
Operator in an ESD coat running a functional test on an assembled board at a test fixture
Functional test · every board tested at the fixture before it reaches packing
04 / Industries

Where a rework line in the field costs more than the board.

Industrial control & automation

PLCs, motor controllers, HMI boards, sensor front-ends and I/O modules. Built for wide temperature swings, vibration and ten-year field life.

BMS & battery management

BMU and BMS boards for lithium packs, from small ESS units to rack-scale systems. High-current traces, Kelvin connections, strict process control on the sense path.

Energy storage & inverters

PCS control boards, cluster management, grid-tie inverter electronics and metering front-ends.

Medical electronics

Patient monitoring, diagnostic instruments and wearables. Documentation and traceability packaged to slot into your own device file.

Automotive & transport

ECU boards, sensor modules and power electronics. AEC-Q parts sourced on request against your approved vendor list.

IoT & connected devices

Gateways, sensor nodes and smart controllers. Fast NPI cycles and high-mix flexibility for designs that are still moving.

05 / Process

Five steps, and you see the output of each one.

No stage runs quietly. Every handover comes back to you as a file: a DFM report, a priced BOM, an AOI image, a test log.

01

Send Gerber, BOM and quantity

Attach the fabrication data and your bill of materials. If the files are sensitive, say so in the first message — we sign your NDA or send ours before anything opens.

Same-day acknowledgement
02

DFM and BOM review

An engineer reads the files against the process, flags what will not assemble cleanly, and quotes the material with alternates and cost-down options listed separately.

48 hours · written report
03

Bare board and material

PCB fabrication and component purchase run in parallel. Long-lead and obsolete lines are raised early, with a substitution proposal rather than a surprise delay.

Long-lead flagged before PO
04

Assembly and test

SMT, DIP, wave or selective solder, then SPI, AOI and X-ray before electrical test. Every station scans the board into the MES. First article goes to you for approval before the run continues.

FAI approval before volume
05

Pack and ship

Serialised, packed to your spec, documented and shipped FOB Shenzhen or delivered duty paid. Cartons can go straight to your customer.

FOB / DDP · export docs included
06 / Quality

Quality you can audit, rather than read about.

A logo on a page proves nothing. What proves something is a document with a number on it, tied to your lot. That is what we hand over. Quality is a department here, not a hat the line leader wears: 53 QA staff across incoming, in-process and outgoing inspection, and 38 engineers on process and test.

Certifications held by the manufacturing plant
StandardScope as certified
ISO 9001:2015Quality management — PCB assembly process and sales
IATF 16949:2016Automotive quality management — circuit board assembly, product design excluded
ISO 14001:2015Environmental management — assembly operations

Certificate numbers, issuing bodies and current validity go out as PDFs with the quotation. We would rather hand you a document you can check than a badge you cannot.

IQC Incoming inspection

Every component lot is checked against the BOM — package, marking, quantity, moisture condition — before it is allowed near a line.

IPQC In process

Solder paste inspected before reflow, AOI after reflow, X-ray on BGA and hidden joints. First article approved by you before the run continues.

FQC Final

Electrical and functional test on every board, visual inspection against IPC class, then packing review against your spec.

DOC Traceability

Component lot numbers, reflow profiles and test results filed against the serial number of each board, retrievable years later.

Ask us for these before you commit

Four documents that separate a real factory from a trading desk
  • Certificate scans with registration numbers
  • First article inspection report for your build
  • AOI and X-ray images of your lot
  • Component lot records and supplier invoices
07 / Capabilities

What the line can take, stated plainly.

If your board sits outside this envelope, we will say so in the DFM report instead of taking the order and finding out later.

Production envelope
Plant12,000 m2 self-built site — one production building plus three dormitory buildings; 400+ staff, of which 53 in quality and 38 in engineering — Songgang, Bao'an District, Shenzhen
Lines10 SMT lines, each with inline SPI and inline AOI; 3 DIP lines for through-hole and mixed boards
Placement10 Fuji NXT placement machines plus 2 Fuji multi-function machines — 0201 (0603 metric) through fine-pitch QFP/QFN, BGA and CSP; feeder load confirmed against your BOM before the run
Panel sizeUp to 450 mm along the conveyor, 50 × 50 mm minimum
Soldering12-zone reflow, wave and selective solder for through-hole, hand-solder station for rework
InspectionSPI before reflow, AOI after reflow (KI-AOI V215-L), X-ray on BGA and hidden joints, first-article measurement
TestIn-circuit and functional test on every board, burn-in on request
SourcingThree purchasing desks — Shenzhen, Hong Kong, United States — with our own import-export licence
ManagementMES runs the whole flow — work order and BOM, material barcode, feeder anti-error scan, station pass records, test results, packing and shipping
Turnaround
Prototype2–3 working days
Small batch, 1–50 pcs5–7 working days
Production, 100+ pcs7–15 working days

Counted from the day your files and material are both ready. Long-lead components move the date, and we tell you that in the quotation rather than two weeks later.

08 / MES · Full-process control

One system from work order to carton. That is what “managed” means here.

Production does not run on paper travellers and shift notes. Order, reel, board and carton are scanned into the same MES, so “what happened to my lot” is a screen you can open rather than a phone call you have to make.

Control scope · one work order, every gate
01
Order & planning

Work order issued · BOM locked · ERP link · production plan

02
Material & warehouse

Supplier barcode · incoming barcode · IQC · put-away · smart rack · issue to line

03
Setup & placement

Solder paste, stencil and squeegee control · station table · printer parameters · feeder scan · mounted-station record · first article

04
DIP & process

DIP station scan · panel loading · route control · work-order range control

05
Test & marking

Test program link · laser marking · board-to-mark binding

06
Pack & ship

Barcode cross-check · accessory binding · carton label · carton weight · IPQC · OQA · finished-goods in and out · kanban

01

Work order released

BOM locked in ERP and the work order issued against your part number — not a line number somebody remembers.

02

Material in

Supplier barcode printed on arrival, IQC scan, bin assigned. A part that fails inspection never reaches a line.

03

Kitting and feeder check

SMT material issued against the BOM; feeder and reel scanned so the wrong value physically cannot be loaded without an error.

04

Setup verified

Stencil and paste-print record captured, first board scanned and inspected before the run is allowed to continue.

05

Placement and reflow

Each station logs its pass, and the reflow profile is stored against the lot that ran through it.

06

AOI and X-ray

Inspection images are attached to the serial number, not printed and filed in a drawer.

07

DIP and test

Insertion scan, then ICT or functional test result recorded board by board.

08

Pack and ship

Barcode match, accessory binding, carton weight, OQC and export documents — all checked before the carton closes.

09 / Contact

Send Gerber, BOM and quantity. Get a priced answer within 24 working hours.

A real engineer reads your files and answers with a DFM report and a priced BOM — not a brochure.

How this works: the form fills in an email to our RFQ inbox and opens your mail app. Attach the Gerber, BOM and pick-and-place files to that message, or paste a download link. Nothing is uploaded to this website.

Manufacturing plant
Building 18, Maozhou Industrial Zone, Shapuwei, Songgang, Bao'an District, Shenzhen 518105, Guangdong, China
Samples & documents
Send to the plant address above; put the RFQ number on the carton so receiving can match it.
Working hours
Mon–Sat 09:00–18:00 (GMT+8) · replies usually inside 4 hours
Before files
NDA on request — we sign yours or send ours, whichever is faster for your legal team.
The plant building in Songgang, Bao'an District, Shenzhen, seen from the site gate
Own site · one production building and three dormitory buildings, 12,000 m² · Building 18, Maozhou Industrial Zone, Shapuwei, Songgang